West Fraser Enhances Williams Lake Plywood With New Westmill Dryer

Westmill supplied a new steam-heated, four-deck jet veneer dryer to replace Dryer #1 at the West Fraser Williams Lake plywood mill in BC. The original Coe M-72 dryer had been in service since the mid-1970s, and the West Fraser said dryer inefficiencies and safety emissions concerns had mounted.

The design constraint was to replace the dryer while maintaining the existing dryer footprint and steam-heating platform. Key objectives were to improve energy efficiency, production, and emissions control. To achieve this, Westmill eliminated one roller section to make room for the two new WestVac seal sections without modifying the existing dryer length. The existing PLC was upgraded rather than completely replaced to automate exhaust and pressure control.

Other key components of the new dryer included Armstrong-Hunt steam coils with steel-finned leading rows for improved durability, Class 3 NYB hot air circulation fans, Westmill’s patented “Quick-Install” dryer door cartridges, stainless steel insulated floor, pneumatic chain tensioner, and four-deck independent drive system with VFD drives.

The new dryer housing and WestVac seal systems addressed the issue of blue haze emissions by maintaining proper sealing within the dryer and preventing emissions from escaping into the plant. Automated exhaust controls replaced manual adjustments, optimizing humidity migration within the dryer and reducing heat loss.

The performance of the new dryer has exceeded expectations. Since startup, the mill has achieved a 25% reduction in steam consumption and a 5% increase in production.

Latest News

Time To Stretch The Legs

Article by Rich Donnell, Editor-in-Chief, Panel World May 2023 In May, I depart for my 17th consecutive Ligna in Hannover, Germany. If the pandemic hadn’t canceled the event in 2021, I suppose this would have…

Dieffenbacher Names New Energy Unit Director

Wolfgang Lashofer has been appointed as the new Managing Director of Dieffenbacher Energy GmbH, which was formed at the beginning of the year following the acquisition of BERTSCHenergy, based in Bludenz, Western Austria. As Managing…

Raute PRS R5 Proving Itself

Raute introduced its Panel Repair Station (PRS) R5 the plywood industry in 2020. Soon there will be 13 units operating in North America. Measuring 33 ft. by 26 ft., the R5 is no larger than…

Find Us On Social

Newsletter

The monthly Panel World Industry Newsletter reaches over 3,000 who represent primary panel production operations.

Subscribe/Renew

Panel World is delivered six times per year to North American and international professionals, who represent primary panel production operations. Subscriptions are FREE to qualified individuals.

Advertise

Complete the online form so we can direct you to the appropriate Sales Representative. Contact us today!