West Fraser Enhances Williams Lake Plywood With New Westmill Dryer
Westmill supplied a new steam-heated, four-deck jet veneer dryer to replace Dryer #1 at the West Fraser Williams Lake plywood mill in BC. The original Coe M-72 dryer had been in service since the mid-1970s, and the West Fraser said dryer inefficiencies and safety emissions concerns had mounted.
The design constraint was to replace the dryer while maintaining the existing dryer footprint and steam-heating platform. Key objectives were to improve energy efficiency, production, and emissions control. To achieve this, Westmill eliminated one roller section to make room for the two new WestVac seal sections without modifying the existing dryer length. The existing PLC was upgraded rather than completely replaced to automate exhaust and pressure control.
Other key components of the new dryer included Armstrong-Hunt steam coils with steel-finned leading rows for improved durability, Class 3 NYB hot air circulation fans, Westmill’s patented “Quick-Install” dryer door cartridges, stainless steel insulated floor, pneumatic chain tensioner, and four-deck independent drive system with VFD drives.
The new dryer housing and WestVac seal systems addressed the issue of blue haze emissions by maintaining proper sealing within the dryer and preventing emissions from escaping into the plant. Automated exhaust controls replaced manual adjustments, optimizing humidity migration within the dryer and reducing heat loss.
The performance of the new dryer has exceeded expectations. Since startup, the mill has achieved a 25% reduction in steam consumption and a 5% increase in production.
Latest News
PELICE 2018 Plans First Wave Of Speakers
The sixth Panel & Engineered Lumber International Conference & Expo (PELICE) will celebrate its 10-year history as part of the event to be held April 13-14, 2018 in the Grand Ballroom North of the Omni…
2017: The Year Of Activity
Article by Rich Donnell, Editor-In-Chief, Panel World November 2017 In the publishing world we’re always working on next year’s media kit or next year’s conference, so sometimes we stumble and have to think a moment…
Nation’s Largest Mass Timber Building Under Construction In Oregon
As a crane lowered a glulam beam and construction workers on either end deftly guided it into connection with two upright wooden columns, a tour group member shook his head and said, “It’s like Lincoln…
Find Us On Social
Newsletter
The monthly Panel World Industry Newsletter reaches over 3,000 who represent primary panel production operations.
Subscribe/Renew
Panel World is delivered six times per year to North American and international professionals, who represent primary panel production operations. Subscriptions are FREE to qualified individuals.
Advertise
Complete the online form so we can direct you to the appropriate Sales Representative. Contact us today!