West Fraser Enhances Williams Lake Plywood With New Westmill Dryer
Westmill supplied a new steam-heated, four-deck jet veneer dryer to replace Dryer #1 at the West Fraser Williams Lake plywood mill in BC. The original Coe M-72 dryer had been in service since the mid-1970s, and the West Fraser said dryer inefficiencies and safety emissions concerns had mounted.
The design constraint was to replace the dryer while maintaining the existing dryer footprint and steam-heating platform. Key objectives were to improve energy efficiency, production, and emissions control. To achieve this, Westmill eliminated one roller section to make room for the two new WestVac seal sections without modifying the existing dryer length. The existing PLC was upgraded rather than completely replaced to automate exhaust and pressure control.
Other key components of the new dryer included Armstrong-Hunt steam coils with steel-finned leading rows for improved durability, Class 3 NYB hot air circulation fans, Westmill’s patented “Quick-Install” dryer door cartridges, stainless steel insulated floor, pneumatic chain tensioner, and four-deck independent drive system with VFD drives.
The new dryer housing and WestVac seal systems addressed the issue of blue haze emissions by maintaining proper sealing within the dryer and preventing emissions from escaping into the plant. Automated exhaust controls replaced manual adjustments, optimizing humidity migration within the dryer and reducing heat loss.
The performance of the new dryer has exceeded expectations. Since startup, the mill has achieved a 25% reduction in steam consumption and a 5% increase in production.
Latest News
EPA Updates, Clarifies Formaldehyde Emission Standards For Composite Wood
The Environmental Protection Agency (EPA) has proposed technical amendments to its formaldehyde emissions standards for composite wood products. Published last week in the Federal Register, the proposed changes primarily address concerns over testing and certification…
Mass Timber Institute Officially Launched In Toronto
The Mass Timber Institute officially launched on October 30 with an industry leaders’ collaboration event held at their offices at 110 Yonge Street in Toronto. Key industry leaders from education and industry participated in this…
Support For Tall Timber Reaches New Heights In ICC Building Code
Prescriptive requirements for wood structures up to 18 stories were among the additions preliminarily approved for the International Building Code following the work of the International Code Council’s ad-hoc Tall Wood Buildings Committee. Wood is…
Find Us On Social
Newsletter
The monthly Panel World Industry Newsletter reaches over 3,000 who represent primary panel production operations.
Subscribe/Renew
Panel World is delivered six times per year to North American and international professionals, who represent primary panel production operations. Subscriptions are FREE to qualified individuals.
Advertise
Complete the online form so we can direct you to the appropriate Sales Representative. Contact us today!