Swanson Group Will Rebuild Oregon Plywood Mill
Plans are to have the new mill finished and ready to start up by mid 2016. The new plant will employ 190 and operate similar to the old facility in terms of capacity and product lines, with a few twists.
According to Swanson, approval for the new building was in mid February. Most of the equipment purchases will take place between now and May, and the new building is expected to be complete and ready by fall 2015.
While Swanson personnel are still looking at equipment types and suppliers and combinations of new and used equipment, Swanson says the mill will utilize a state-of-the-art triple-spindle peeling system with sheet and random stacking; two dryers, one handling wides and the other randoms, feeding to respective stacking systems; and a layup line and related systems that enable more overlay production.
Latest News
APA Selects New President
Mark Tibbetts has joined the staff of APA—The Engineered Wood Assn. as he transitions to the president position July 1, when Ed Elias retires. Tibbetts was selected by the group’s Board of Trustees through a lengthy search process…
OSB Output Had Uptick In 2020
North America structural panel production was 33.201 billion SF in 2020, down 0.8% from 2019, according to APA—The Engineered Wood Assn. Both the U.S. and Canada showed slight declines. However in the U.S., OSB production was…
Starwood Orders Thin-Board Plant
Turkish wood-based materials manufacturer Starwood has ordered its second thin-board plant for the production of thin MDF/HDF to be built near Inegöl. The new plant is designed to run at 2,000 mm/s. The core of the scope of supply is the…
Bamboo Mill Gains Steam
Resource Fiber, a leader in efforts to manufacture commercial bamboo products, plans to establish its first full-scale production plant in Sulligent, Ala. Resource Fiber plans to invest $3.6 million in the Lamar County facility, where it will produce engineered…
Find Us On Social
Newsletter
The monthly Panel World Industry Newsletter reaches over 3,000 who represent primary panel production operations.
Subscribe/Renew
Panel World is delivered six times per year to North American and international professionals, who represent primary panel production operations. Subscriptions are FREE to qualified individuals.
Advertise
Complete the online form so we can direct you to the appropriate Sales Representative. Contact us today!