Plants Get Smart With Dryer Infeed

 

googletag.cmd.push(function() { googletag.display('div-gpt-ad-1548376180744-0'); });

Sweed’s recently patented “Smart Pause” technology allows dryer infeed operators additional time to address misfeeds or other veneer feeding issues, while permitting the continued operation of the veneer dryer, thus maximizing dryer fill rates. Several plants with current and pending projects will be realizing the benefits of Smart Pause.

Georgia-Pacific in Taylorsville, Mississippi recently commissioned a new 4-deck dryer equipped with Sweed’s Smart Pause infeed. Soon to come for G-P are two new installations in early 2020: a 4-deck and a 6-deck dryer, both equipped with Smart Pause infeed. Also joining the Smart Pause trend is Weyerhaeuser in Emerson, Arkansas, which has a pending dryer installation slated for spring 2020.

Sweed’s Smart Pause dryer infeed functions independently of the veneer dryer. Utilizing additional hardware and innovative software and controls designed by Sweed, each deck of the infeed roll case is operated individually with timing and variable speed controls, providing a platform for the program to manage veneer under normal and abnormal conditions, without affecting the performance of the dryer itself. The Smart Pause program is initiated upon the detection of missing sheets, and/or by the operator who has identified an issue. In either case, the operator has a period of up to 20 seconds (depending on feed speeds) to fix the misfeed and speed the infeed, allowing veneer to “catch-up” and be lapped prior to dryer entry.

 

googletag.cmd.push(function() { googletag.display('div-gpt-ad-1548375988914-0'); });

Latest News

Cross-Laminated Timber Fire Testing Sees Promising Results

The International Code Council Ad-hoc Committee on Tall Wood Buildings provided five fire scenarios that were tested in each of the two one-bedroom apartments constructed using mass timber in a multi-story apartment building. The test…

Two-Story CLT Structure Simulated With 6.7 Earthquake

A two-story cross-laminated timber (CLT) structure is being subjected to the forces produced by a 1994 6.7 Northridge earthquake. The engineered simulation is expected to reveal ways in which tall wood buildings could survive damaging…

googletag.cmd.push(function() { googletag.display('div-gpt-ad-1589916740199-0'); });

Find Us On Social

googletag.cmd.push(function() { googletag.display('div-gpt-ad-1548376916922-0'); });
googletag.cmd.push(function() { googletag.display('div-gpt-ad-1548376961890-0'); });
googletag.cmd.push(function() { googletag.display('div-gpt-ad-1548377005333-0'); });
Newsletter

The monthly Panel World Industry Newsletter reaches over 3,000 who represent primary panel production operations.

Subscribe/Renew

Panel World is delivered six times per year to North American and international professionals, who represent primary panel production operations. Subscriptions are FREE to qualified individuals.

Advertise

Complete the online form so we can direct you to the appropriate Sales Representative. Contact us today!