Peak Renewables Announces SYP Pellet Mill in Alabama

Vancouver, Canada-based Peak Renewables plans to build a 180,000 metric tons per year wood pellet mill in Dothan, Ala. The $30 million project will utilize residuals from Rex Lumber sawmills in the area.

Construction on the facility is expected to be completed by mid-2023. Peak is building the plant adjacent the SmartLam cross-laminated timber plant and upcoming glulam facility in Dothan.

Peak and SmartLam have some common ownership, including longtime sawmill construction and equipment supplier Brian Fehr. Scott Bax, formerly COO with Pinnacle Renewable Energy, is the CEO of Peak, which is also a partner in a proposed OSB facility in Prince Albert, Saskatchewan called One Sky Forest Products.

Latest News

Two-Story CLT Structure Simulated With 6.7 Earthquake

A two-story cross-laminated timber (CLT) structure is being subjected to the forces produced by a 1994 6.7 Northridge earthquake. The engineered simulation is expected to reveal ways in which tall wood buildings could survive damaging earthquakes. Workers constructed...

EPA Withdraws Final Rule Delay For Formaldehyde

After receiving negative feedback from the industry, the Environmental Protection Agency (EPA) withdrew its Direct Final Rule Wednesday, removing delayed compliance dates for certain formaldehyde emissions standards on wood products. “Since the direct final rule and...

Find Us On Social

Newsletter

The monthly Panel World Industry Newsletter reaches over 3,000 who represent primary panel production operations.

Subscribe/Renew

Panel World is delivered six times per year to North American and international professionals, who represent primary panel production operations. Subscriptions are FREE to qualified individuals.

Advertise

Complete the online form so we can direct you to the appropriate Sales Representative. Contact us today!