Mercer Hits Milestone On Theodore Roosevelt President Library

One year after groundbreaking, Mercer Mass Timber (MMT) has announced the completion of the first phase of construction on the Theodore Roosevelt Presidential Library, a future cultural destination located in the heart of the North Dakota Badlands, and the largest mass timber project in the state to date. 

Phase one construction began one year ago and is centered on the museum building and its dramatic roof structure of sweeping curves and complex geometry. The roof, designed to echo the rolling topography of the Badlands, required precisely engineered connections and joints, supported by steel wrapped in wood to maintain a seamless timber look. 

The Theodore Roosevelt Presidential Library is the largest use of mass timber in North Dakota to date. MMT is supplying approximately 1,800 m³ of CLT and glulam for the 93,000 sq. ft. structure, including custom glulam connections supporting the museum’s curved roof.

 The final mass timber delivery date is scheduled for June 1, 2025, marking the official start of phase two of construction, which will include Mercer Mass Timber contributing canopies designed to support photovoltaic panels—expanding mass timber use in outdoor architectural features.

“This project is a testament to what visionary design combined with advanced mass timber engineering can create,” says Ricardo Brites, Director of Engineering & VDC at Mercer Mass Timber. “From custom made glulam connections to a curved roof profile that’s as complex as it is beautiful, this project sets a new bar for civic architecture.”

Incorporating mass timber is a means to honor Theodore Roosevelt’s enduring legacy of conservation with a beautiful nature-forward design. Mass Timber also offers innovative construction advantages, including 25–40% lower carbon emissions, faster installation, and strong fire and earthquake resistance for enhanced safety.

The Theodore Roosevelt Presidential Library is set to open on July 4, 2026, and every living president is anticipated to be in attendance.

Latest News

Chris Swanson Named Swanson Group President

Chris Swanson Named Swanson Group PresidentOregon-based Swanson Group announced the appointment of Chris Swanson as President. In the expanded role he will assume control of the day-to-day management of the company. This transition ensures the continuation of family...

USA Bioenergy, LP Sign Feedstock Letter Of Intent 

USA Bioenergy, LP Sign Feedstock Letter Of Intent USA BioEnergy (USABE) has signed a letter of intent with LP Building Solutions (LP) outlining plans to enter a long-term supply agreement for sustainably sourced wood fiber to support operations at USAB’s planned Texas...

RedBuilt Appoints Ted Osterberger As CEO

RedBuilt Appoints Ted Osterberger As CEOHampton Lumber and affiliate, RedBuilt, are pleased to announce the appointment of Ted Osterberger as Chief Executive Officer of RedBuilt, effective June 1, 2025. Osterberger succeeds Don Schwabe, who will retire later this year...

Find Us On Social

Newsletter

The monthly Panel World Industry Newsletter reaches over 3,000 who represent primary panel production operations.

Subscribe/Renew

Panel World is delivered six times per year to North American and international professionals, who represent primary panel production operations. Subscriptions are FREE to qualified individuals.

Advertise

Complete the online form so we can direct you to the appropriate Sales Representative. Contact us today!