First CLT Office Opens In DC

Opened in fall 2022, the first mass timber commercial building in the U.S. capital city features more than 108,000 sq. ft. of mass timber. The building is an innovative retrofit at 80 M Street SE in Washington, DC: Termed an overbuild—extra stories atop an existing building—the expansion features three floors, where columns of mass timber are visible from the interior.

The project used 1,300 tons of CLT, with the mass timber addition sized at 108,000 sq. ft. of the overall 286,000 sq. ft. space. The developer of the project is Columbia Property Trust; architect is Hickok Cole. Engineering firm Arup performed the retrofit, and the property opened late September. First tenants are the American Trucking Assn. and BP America. Nordic Structures supplied the glulam beams and columns used in the project, and Katerra supplied the CLT.

Latest News

Hexion Touts Renewable Adhesive

Hexion Touts Renewable AdhesiveHexion, a leader in adhesives, systems, and AI technologies for wood panel manufacturing, announced a partnership with Bloom Biorenewables, a Swiss startup, which has developed a breakthrough method for preserving the natural adhesive...

GP Transitions Leadership Role

GP Transitions Leadership RoleChristian Fischer, Georgia-Pacific president and CEO, announced in July he is retiring from the company at the end of October and will work to transition his responsibilities. He joined GP in 1989 and has held numerous leadership roles....

Find Us On Social

Newsletter

The monthly Panel World Industry Newsletter reaches over 3,000 who represent primary panel production operations.

Subscribe/Renew

Panel World is delivered six times per year to North American and international professionals, who represent primary panel production operations. Subscriptions are FREE to qualified individuals.

Advertise

Complete the online form so we can direct you to the appropriate Sales Representative. Contact us today!