First CLT Office Opens In DC

Opened in fall 2022, the first mass timber commercial building in the U.S. capital city features more than 108,000 sq. ft. of mass timber. The building is an innovative retrofit at 80 M Street SE in Washington, DC: Termed an overbuild—extra stories atop an existing building—the expansion features three floors, where columns of mass timber are visible from the interior.

The project used 1,300 tons of CLT, with the mass timber addition sized at 108,000 sq. ft. of the overall 286,000 sq. ft. space. The developer of the project is Columbia Property Trust; architect is Hickok Cole. Engineering firm Arup performed the retrofit, and the property opened late September. First tenants are the American Trucking Assn. and BP America. Nordic Structures supplied the glulam beams and columns used in the project, and Katerra supplied the CLT.

Latest News

TSI Offers Dryer Replacement Plan

For many years TSI has been steadily upgrading its clients’ dryer fleets with new drums and other improvements, like flat-back elbows. The requirement is usually to fit a new drum into the same space as the existing drum and to improve both quality…

APA Names New Director Of Quality Services

Charles Hartke has joined APA—The Engineered Wood Assn. as director of the Quality Services Division. Hartke will oversee APA’s accredited certification programs, auditing and inspection of member products, and the staff who convey standards…

Find Us On Social

Newsletter

The monthly Panel World Industry Newsletter reaches over 3,000 who represent primary panel production operations.

Subscribe/Renew

Panel World is delivered six times per year to North American and international professionals, who represent primary panel production operations. Subscriptions are FREE to qualified individuals.

Advertise

Complete the online form so we can direct you to the appropriate Sales Representative. Contact us today!