Dieffenbacher To Supply Unilin Recycling Plant 

In October 2024, Unilin and Dieffenbacher announced an agreement to introduce and further commercialize Unilin’s “Osiris” wood fiberboard recycling technology. Under this agreement, Dieffenbacher became the preferred partner for offering Osiris machine and equipment technology into fiberboard production processes globally.

Now, the companies are taking the next step in their partnership with Dieffenbacher supplying Unilin with an industrial-scale fiberboard recycling plant called “Osiris 2.0,” which succeeds Unilin’s “Osiris 1.0” industrial pilot installation at its MDF plant in Bazeilles, France. The new plant will boost Unilin’s fiberboard recycling capacity from 1 to 10 tonnes per hour and will be able to process post-consumer MDF material.

“Dieffenbacher is currently the only supplier that can provide us with such a large capacity and whose equipment can recycle post-consumer fiberboard material, e.g., from bulky waste, in addition to production waste and residual materials from our own MDF and HDF production,” says Jan Gallet, General Manager MDF, Unilin.

Dieffenbacher’s scope of supply for Unilin includes the fiber transport and storage system, fiber sifters, glue preparation and dosing, PROjet glue-saving system, pneumatic systems and an emission control system. The steam explosion vessel for the re-fibering process was newly designed by Dieffenbacher Energy and optimized for fiberboard recycling. Dieffenbacher will also be responsible for the steel construction, transport and conveyor systems, and the plant’s electrics and automation.

Startup of the fiberboard recycling plant is planned for the fall of 2025.

Latest News

Forest Service Says 4FRI Is Still Alive

Following its cancellation of the Phase 2 Request for Proposal (RFP) and bid selection in September, which caught everybody by surprise, the Forest Service “has gone back to work” on how to move forward with stewardship and treatment of the 520,000 acres that was included in Phase 2, which was part of the 4 Forests…

CalPlant I Regroups, Sale Is Possible

CalPlant I, LLC, which took 25 years to develop and build a rice straw-based medium density fiberboard plant and produce its first board late last year in Willows, Calif., has voluntarily filed for Chapter 11 bankruptcy protection and intends to conduct a court-supervised sale process…

NewLife Gains Full Production

NewLife Forest Restoration has ramped up production at its new engineered wood products plant in Bellemont, Ariz., while also increasing forest restoration work in service of its 4 Forest Restoration Initiative (4FRI) Phase 1 Forest Service stewardship contract that seeks to thin and treat more than 300,000 acres at risk of…

Find Us On Social

Newsletter

The monthly Panel World Industry Newsletter reaches over 3,000 who represent primary panel production operations.

Subscribe/Renew

Panel World is delivered six times per year to North American and international professionals, who represent primary panel production operations. Subscriptions are FREE to qualified individuals.

Advertise

Complete the online form so we can direct you to the appropriate Sales Representative. Contact us today!