Dieffenbacher To Supply Unilin Recycling Plant 

In October 2024, Unilin and Dieffenbacher announced an agreement to introduce and further commercialize Unilin’s “Osiris” wood fiberboard recycling technology. Under this agreement, Dieffenbacher became the preferred partner for offering Osiris machine and equipment technology into fiberboard production processes globally.

Now, the companies are taking the next step in their partnership with Dieffenbacher supplying Unilin with an industrial-scale fiberboard recycling plant called “Osiris 2.0,” which succeeds Unilin’s “Osiris 1.0” industrial pilot installation at its MDF plant in Bazeilles, France. The new plant will boost Unilin’s fiberboard recycling capacity from 1 to 10 tonnes per hour and will be able to process post-consumer MDF material.

“Dieffenbacher is currently the only supplier that can provide us with such a large capacity and whose equipment can recycle post-consumer fiberboard material, e.g., from bulky waste, in addition to production waste and residual materials from our own MDF and HDF production,” says Jan Gallet, General Manager MDF, Unilin.

Dieffenbacher’s scope of supply for Unilin includes the fiber transport and storage system, fiber sifters, glue preparation and dosing, PROjet glue-saving system, pneumatic systems and an emission control system. The steam explosion vessel for the re-fibering process was newly designed by Dieffenbacher Energy and optimized for fiberboard recycling. Dieffenbacher will also be responsible for the steel construction, transport and conveyor systems, and the plant’s electrics and automation.

Startup of the fiberboard recycling plant is planned for the fall of 2025.

Latest News

Regulatory Freeze Issued On EPA Formaldehyde Regulation

President Trump issued an Executive Order over the weekend that freezes all recently published EPA regulations for a 60-day review period. This review period delays the initial effective date for the EPA formaldehyde rule, pushing it from February 10 to March 21,...

Soon-To-Close Georgia Dome Hosted Woodworking Events

The Georgia Dome hosted the NFC championship game, the last football event held at the venue. Several other events are planned in the coming weeks. Then the Georgia Dome will be razed and replaced by the Mercedes-Benz Stadium, now under construction just south of the...

Find Us On Social

Newsletter

The monthly Panel World Industry Newsletter reaches over 3,000 who represent primary panel production operations.

Subscribe/Renew

Panel World is delivered six times per year to North American and international professionals, who represent primary panel production operations. Subscriptions are FREE to qualified individuals.

Advertise

Complete the online form so we can direct you to the appropriate Sales Representative. Contact us today!