Columbia Plywood Amends Permit In Old Fort, Hopes To Add AirBurners FireBox
The North Carolina Department of Environmental Quality’s Division of Air Quality (DAQ) is accepting public comment on a draft air quality permit modification for Columbia Plywood Corp.—Columbia Carolina Division, the company’s plywood manufacturing facility in Old Fort, NC.
If approved, the modification would allow Columbia Plywood to install an air curtain incinerator unit from AirBurners at the facility to burn its wood waste for disposal—increasing potential emissions thresholds, thus requiring a Title V air quality permit.
AirBurners incinerators, branded as FireBox, were designed principally as a pollution control device for open burning. The primary objective of an air curtain machine is to reduce the particulate matter, which results from burning clean wood waste. Using a technology called “air curtain,” the smoke particles are trapped and reburned, reducing them to an acceptable limit per EPA guidelines.
Clean wood waste is loaded into the FireBox and an accelerant is used to ignite the pile. The air curtain is not engaged until the fire has grown in strength, usually after 15 to 20 minutes. Once engaged, the air curtain then runs at a steady state throughout the burn operation, and the waste wood is loaded at a rate consistent with the rate of burn. The smallest machine offered by AirBurners burns at a rate of 1-2 tons per hour, with the largest burning in excess of 10 tons per hour.
All public comments made to the DAQ before September 11, 2025 will be considered before a final decision on the proposed permit is made.
Latest News
Tall Wood Building Committee Will Work On 2021 Global Building Codes
The American Wood Council says the International Code Council (ICC) Board of Directors approval of the formation of a Tall Wood Building Ad Hoc Committee. The committee will be made up of stakeholders, code officials and other interested parties. The committee will...
Kronotex Announces South Carolina Laminate Flooring, Panel Mill Expansion
KronotexUSA and its parent firm Swiss Krono Group will invest $230 million to build a high-density fiberboard mill and expand the company's laminate flooring production in Barnwell, South Carolina, a move which will create 105 new jobs over the next few years....
World’s Tallest Timber Tower Under Construction In Canada
When complete in 2017, the 18-storey (53m) tower, called Brock Commons, will house hundreds of students at the University of British Columbia (UBC). Unless overtaken by other ambitious timber towers now at design or proposal stage, the CAN$51.5m residence is set to be...
Find Us On Social
Newsletter
The monthly Panel World Industry Newsletter reaches over 3,000 who represent primary panel production operations.
Subscribe/Renew
Panel World is delivered six times per year to North American and international professionals, who represent primary panel production operations. Subscriptions are FREE to qualified individuals.
Advertise
Complete the online form so we can direct you to the appropriate Sales Representative. Contact us today!