Columbia Plywood Amends Permit In Old Fort, Hopes To Add AirBurners FireBox 

The North Carolina Department of Environmental Quality’s Division of Air Quality (DAQ) is accepting public comment on a draft air quality permit modification for Columbia Plywood Corp.—Columbia Carolina Division, the company’s plywood manufacturing facility in Old Fort, NC.

If approved, the modification would allow Columbia Plywood to install an air curtain incinerator unit from AirBurners at the facility to burn its wood waste for disposal—increasing potential emissions thresholds, thus requiring a Title V air quality permit.

AirBurners incinerators, branded as FireBox, were designed principally as a pollution control device for open burning. The primary objective of an air curtain machine is to reduce the particulate matter, which results from burning clean wood waste. Using a technology called “air curtain,” the smoke particles are trapped and reburned, reducing them to an acceptable limit per EPA guidelines.

Clean wood waste is loaded into the FireBox and an accelerant is used to ignite the pile. The air curtain is not engaged until the fire has grown in strength, usually after 15 to 20 minutes. Once engaged, the air curtain then runs at a steady state throughout the burn operation, and the waste wood is loaded at a rate consistent with the rate of burn. The smallest machine offered by AirBurners burns at a rate of 1-2 tons per hour, with the largest burning in excess of 10 tons per hour.

All public comments made to the DAQ before September 11, 2025 will be considered before a final decision on the proposed permit is made.

Latest News

Oregon’s Rosboro Announces Sale Of Wood Products Plants

Oregon’s Rosboro Announces Sale Of Wood Products Plants  Wood products manufacturer Rosboro of Springfield on Tuesday announced that it has sold its manufacturing business to Wynnchurch Capital, an Illinois-based investment firm. The sale for an undisclosed...

Freres Lumber Unveils MPP, Adding Plant In 2017

Freres Lumber Unveils MPP, Adding Plant In 2017Capitalizing on the current interest in building large-scale wooden buildings and more multi-story wooden structures, longtime Oregon plywood and veneer producer Freres Lumber has introduced the “Mass Plywood Panel”...

Tallest Timber Building In The U.S. Opens Its Doors

The seven-story T3 tower features 220,000 square feet of prefabricated CLT timber panels and nail-laminated timber cladding. It became the largest timber building in the U.S. when it opened Wednesday in Minneapolis. Designed by Vancouver-based Michael Green...

Find Us On Social

Newsletter

The monthly Panel World Industry Newsletter reaches over 3,000 who represent primary panel production operations.

Subscribe/Renew

Panel World is delivered six times per year to North American and international professionals, who represent primary panel production operations. Subscriptions are FREE to qualified individuals.

Advertise

Complete the online form so we can direct you to the appropriate Sales Representative. Contact us today!