Columbia Plywood Amends Permit In Old Fort, Hopes To Add AirBurners FireBox 

The North Carolina Department of Environmental Quality’s Division of Air Quality (DAQ) is accepting public comment on a draft air quality permit modification for Columbia Plywood Corp.—Columbia Carolina Division, the company’s plywood manufacturing facility in Old Fort, NC.

If approved, the modification would allow Columbia Plywood to install an air curtain incinerator unit from AirBurners at the facility to burn its wood waste for disposal—increasing potential emissions thresholds, thus requiring a Title V air quality permit.

AirBurners incinerators, branded as FireBox, were designed principally as a pollution control device for open burning. The primary objective of an air curtain machine is to reduce the particulate matter, which results from burning clean wood waste. Using a technology called “air curtain,” the smoke particles are trapped and reburned, reducing them to an acceptable limit per EPA guidelines.

Clean wood waste is loaded into the FireBox and an accelerant is used to ignite the pile. The air curtain is not engaged until the fire has grown in strength, usually after 15 to 20 minutes. Once engaged, the air curtain then runs at a steady state throughout the burn operation, and the waste wood is loaded at a rate consistent with the rate of burn. The smallest machine offered by AirBurners burns at a rate of 1-2 tons per hour, with the largest burning in excess of 10 tons per hour.

All public comments made to the DAQ before September 11, 2025 will be considered before a final decision on the proposed permit is made.

Latest News

The Martins Do It Again

Nearly ninety-five years after Roy Otis Martin purchased Creston Lumber Mill in Alexandria, Louisiana for $32,000 and renamed it Roy O. Martin Lumber Company, the Martins have started up a $280 million Greenfield oriented strandboard plant in Corrigan, Texas…

Arauco-Grayling Is Paving The Way

As of the end of August, Arauco reported 1,526,355 total project hours completed since April 2017 at its particleboard plant under construction in Grayling, Mich. The company also reported the use of 802 contractors and the hiring of 175 employees. The plant is built...

Find Us On Social

Newsletter

The monthly Panel World Industry Newsletter reaches over 3,000 who represent primary panel production operations.

Subscribe/Renew

Panel World is delivered six times per year to North American and international professionals, who represent primary panel production operations. Subscriptions are FREE to qualified individuals.

Advertise

Complete the online form so we can direct you to the appropriate Sales Representative. Contact us today!