Softwood Board, FS Announce Mass Timber Awards

 

googletag.cmd.push(function() { googletag.display('div-gpt-ad-1548376180744-0'); });

The Softwood Lumber Board (SLB) and USDA Forest Service recently awarded $2 million total to six projects that highlight innovative architectural design and mass timber’s significant role in carbon reduction. According to SLB officials, lessons learned from each project will be shared with the construction community to help support future projects, including cost analyses, life cycle assessments and other research results.

Here are the buildings:

• New medical center in Vancouver, Wash.: 176,000 sq. ft., four-story mass timber over steel structure uses CLT and glulam.

• High-rise multifamily in downtown Denver: 12-story building with nine levels of mass timber. Features glulam columns and beams and CLT decks.

• Low income charter school, Long Island, NY: a five-story hybrid CLT building uses more than 36,000 cubic feet of CLT.

• New 42,456 sq. ft. industrial warehouse in Kent, Wash., features CLT panels and glulam beams and columns.

• Intro Cleveland Phase 2: Massive 750,000 sq. ft. mixed use development is the largest mass timber project in the U.S. Phase 2 will build a 16-story mass timber building with mass timber tower consisting of glulam columns and girders with CLT floor slabs. The team projects wood to comprise about 50% of the total structure.

• Three-story 18,780 sq. ft. office space building in Portland, Ore., with major goal of proving out the rocking shear wall system and showing how this advanced technology can exceed code and provide a cost-effective seismic solution for three to 12 story buildings.

 

googletag.cmd.push(function() { googletag.display('div-gpt-ad-1548375988914-0'); });

Latest News

AraucoPly Commemorates 20 Years In North America

It’s been 20 years since the first containers of AraucoPly plywood made their way from Chile to the United States in 1997. Arauco celebrated the anniversary in a special event held at its booth during…

Cross-Laminated Timber Fire Testing Sees Promising Results

The International Code Council Ad-hoc Committee on Tall Wood Buildings provided five fire scenarios that were tested in each of the two one-bedroom apartments constructed using mass timber in a multi-story apartment building. The test…

Two-Story CLT Structure Simulated With 6.7 Earthquake

A two-story cross-laminated timber (CLT) structure is being subjected to the forces produced by a 1994 6.7 Northridge earthquake. The engineered simulation is expected to reveal ways in which tall wood buildings could survive damaging…

googletag.cmd.push(function() { googletag.display('div-gpt-ad-1589916740199-0'); });

Find Us On Social

googletag.cmd.push(function() { googletag.display('div-gpt-ad-1548376916922-0'); });
googletag.cmd.push(function() { googletag.display('div-gpt-ad-1548376961890-0'); });
googletag.cmd.push(function() { googletag.display('div-gpt-ad-1548377005333-0'); });
Newsletter

The monthly Panel World Industry Newsletter reaches over 3,000 who represent primary panel production operations.

Subscribe/Renew

Panel World is delivered six times per year to North American and international professionals, who represent primary panel production operations. Subscriptions are FREE to qualified individuals.

Advertise

Complete the online form so we can direct you to the appropriate Sales Representative. Contact us today!