LOGSTACKERS HEAD TO CANADA

Allied Systems Co., parent company for Wagner Logstackers, is excited about its recent shipments of two new 60 ton operating
capacity Wagner Logstackers into Canada. Wagner has long been known for its durable single pass Logstacker, and the new generation models build on that legacy by adding a number of new improvements coveted by operators and maintenance staff alike, such as:

  • Seriously fast hoist speeds
  • Lighted ground level service bay for easy routine maintenance
  • Lighted stairways for safe and easy access on and off the machine
  • Newly designed cooling package with easy maintenance access
  • More spacious and comfortable cab with improved visibility
  • Longer component service life and maintenance intervals

The four-wheel drive Wagner L4120 maintains traction in the toughest conditions while the two-wheel drive L120 is perfect for improved yards, and boasts even better fuel efficiency and a tighter turning radius. Whether you’re handling cut-to-length or treelength logs, Wagner Logstackers can handle it all quickly, efficiently and for the lowest total cost.

Wagner Logstackers are designed and built in Sherwood Ore., USA.

 

Latest News

Dieffenbacher Names New Energy Unit Director

Wolfgang Lashofer has been appointed as the new Managing Director of Dieffenbacher Energy GmbH, which was formed at the beginning of the year following the acquisition of BERTSCHenergy, based in Bludenz, Western Austria. As Managing Director of Dieffenbacher Energy, Lashofer takes over the management of the newly established Energy Business Unit…

Raute PRS R5 Proving Itself

Raute introduced its Panel Repair Station (PRS) R5 the plywood industry in 2020. Soon there will be 13 units operating in North America. Measuring 33 ft. by 26 ft., the R5 is no larger than most manual repair cells. It requires no foundations, meaning it can be up and running within two weeks of delivery…

India’s Greenpanel Grows With MDF

India’s largest MDF manufacturer, Greenpanel Industries Ltd., has ordered its third MDF plant from Dieffenbacher. The new thin-board line based on Dieffenbacher’s smart plant concept, CEBRO, will be added in Routhusuramala, Andhra Pradesh. That’s the same site where Greenpanel commissioned a Dieffenbacher MDF line with a 56 m long CPS, the longest continuous press in…

Kronospan Announces Further Expansion At Alabama Site

Kronospan will begin construction of a new OSB manufacturing plant on its 460 acre site in Oxford, Ala. The new facility, employing 125, will have a footprint composed of 44 acres of new development, including substantial areas designated for product storage, rail spur and loading docks. Groundbreaking for the $350 million facility is scheduled for later this year…

Find Us On Social

Newsletter

The monthly Panel World Industry Newsletter reaches over 3,000 who represent primary panel production operations.

Subscribe/Renew

Panel World is delivered six times per year to North American and international professionals, who represent primary panel production operations. Subscriptions are FREE to qualified individuals.

Advertise

Complete the online form so we can direct you to the appropriate Sales Representative. Contact us today!