First CLT Office Opens In DC
Opened in fall 2022, the first mass timber commercial building in the U.S. capital city features more than 108,000 sq. ft. of mass timber. The building is an innovative retrofit at 80 M Street SE in Washington, DC: Termed an overbuild—extra stories atop an existing building—the expansion features three floors, where columns of mass timber are visible from the interior.
The project used 1,300 tons of CLT, with the mass timber addition sized at 108,000 sq. ft. of the overall 286,000 sq. ft. space. The developer of the project is Columbia Property Trust; architect is Hickok Cole. Engineering firm Arup performed the retrofit, and the property opened late September. First tenants are the American Trucking Assn. and BP America. Nordic Structures supplied the glulam beams and columns used in the project, and Katerra supplied the CLT.
Latest News
Dear Fred, From Kenneth
Article by Rich Donnell, Editor-In-Chief, Panel World March 2022 – While reading a draft of this issue’s cover story on Roseburg’s new LVL plant in Chester, SC, representing Roseburg’s first ever greenfield project in the South, I glanced at the letter that I’ve always kept on the bulletin board up and behind my iMac monitor…
FLAMEX Names New President
FLAMEX Inc. announced Tony Thomas as its new President, succeeding Allen Wagoner after 13 years at that post. Thomas has been with the company for almost 32 years and has been serving as Vice President. Ed Pridgen assumes the role as Vice President in addition to his position as MINFOG Product Manager…
Find Us On Social
Newsletter
The monthly Panel World Industry Newsletter reaches over 3,000 who represent primary panel production operations.
Subscribe/Renew
Panel World is delivered six times per year to North American and international professionals, who represent primary panel production operations. Subscriptions are FREE to qualified individuals.
Advertise
Complete the online form so we can direct you to the appropriate Sales Representative. Contact us today!