CalPlant I Nears The Finish (Or Starting) Line

googletag.cmd.push(function() { googletag.display('div-gpt-ad-1548376180744-0'); });

CALPLANT I NEARS THE FINISH (OR STARTING) LINEOne of the many intriguing tales to emerge from the Panel & Engineered Lumber International Conference & Expo held March 12-13 at the Omni Hotel in Atlanta was the plight of CalPlant I, the new rice straw-based medium density fiberboard plant entering startup in Willows, Calif. Co-founder and CEO Jerry Uhland told the story of the long and winding road, and the roadblocks therein, to reach the financial and physical realization of the plant, which is why his talk was entitled, 20 Years, 8 Months and 17 Days…But Who’s Counting.

Uhland told of the challenge California rice farmers faced with how to dispose of their post harvest rice straw. Controlled burns had been the primary means, but diminishing air quality prompted a legislative ban in 1991 on open field burning of rice fields, phasing out burning over a 10-year period. Flooding fields to decompose rice straw became the most valuable option but drained a precious resource in a drought prone region.

CalAg was founded in 1996 by longtime California rice industry veterans Jim Boyd and his family and Uhland to address the challenges to rice growers and propose a possible solution. Their trial work on rice straw-based MDF began and the first successful MDF trial was in 1997 at the BioComposites Centre in Bangor, Wales.

Thus began the long and winding road of working with equipment suppliers while trying to get the project funded. Uhland referred to the first three funding efforts that fell short as “Capital Raising Take I, II and III.” Finally in 2017 it came together through bond orders and allocations, resulting in a $315 million financing.

The German-based equipment supplier Siempelkamp had become a crucial partner by then, and the project began construction immediately after funding closed. Today there’s a 325,000 square foot facility on site nearly ready to produce 140MMSF annually of MDF.

Commissioning of some units of operation commenced prior to Siempelkamp departing for Germany mid-March during COVID-19. Siempelkamp engaged a U.S.-based sub to continue load and no-load testing of the production line (i.e. turning the press, load testing post-press processes—CalPlant purchased 8×16 wood-based MDF to test stacking, intermediate storage, sanding, sawing, etc.). Siempelkamp will need approximately five weeks once they return to produce the first board, Uhland estimates.

For additional coverage of Uhland’s presentation at PELICE, and other presentations, see the May 2020 issue of Panel World.

RELATED ARTICLES

CALPLANT I GEARS UP FOR FIRST BOARD

CALAG RICE STRAW MDF PLANT

 

googletag.cmd.push(function() { googletag.display('div-gpt-ad-1548375988914-0'); });

Latest News

Roseburg Promotes Grady Mulbery

Allyn Ford, president and CEO of Oregon-based Roseburg Forest Products, announced the promotion of Grady Mulbery to Vice President of Manufacturing for the company. In this newly created position Mulbery will oversee all manufacturing facilities…

Let the Ramp-Up Begin…

Story by Jennifer McCary, Senior Associate Editor Next spring will mark five years since Louisiana-Pacific started up what was to be its flagship OSB facility just a few miles from my home in Thomasville, Ala.…

Sawmill Project Plans New Design

Multiple fingerjointing lines and edge gluing production will be part of a $250 million wood processing complex to be built in Winslow, Ariz. by Pioneer Associates, based in Billings, Mont. The project will also comprise…

googletag.cmd.push(function() { googletag.display('div-gpt-ad-1589916740199-0'); });

Find Us On Social

googletag.cmd.push(function() { googletag.display('div-gpt-ad-1548376916922-0'); });
googletag.cmd.push(function() { googletag.display('div-gpt-ad-1548376961890-0'); });
googletag.cmd.push(function() { googletag.display('div-gpt-ad-1548377005333-0'); });
Newsletter

The monthly Panel World Industry Newsletter reaches over 3,000 who represent primary panel production operations.

Subscribe/Renew

Panel World is delivered six times per year to North American and international professionals, who represent primary panel production operations. Subscriptions are FREE to qualified individuals.

Advertise

Complete the online form so we can direct you to the appropriate Sales Representative. Contact us today!