CalPlant I Gears Up For First Board

CalPlant I, the new rice straw-based MDF plant in Willows, Calif.,is starting up and commissioning all areas of the mill. This includes the straw preparation building, where 20 loaded straw trailers have been staged; the refiner and dryer area, where dust collection and pneumatic transfer is undergoing final calibration; the first truckload of pMDI glue has arrived; forming and pressing is beginning pneumatic transfer of fiber and commissioning of the press sizing systems; commissioning of the intermediate stacking, sanding and sawing system; and likewise for the spark detection and quenching system. First board production is anticipated during the first week of November.
RELATED ARTICLES
CALPLANT I NEARS THE FINISH (OR STARTING) LINE
Latest News
Huber Announces Plans For New Mill In Minnesota
Huber Engineered Woods LLC (HEW), a subsidiary of J.M. Huber Corp., has announced that it will build a new oriented strandboard (OSB) facility in…
2020 APA Safety and Health Award Winners Announced
APA–The Engineered Wood Assn. has announced the winners of its 2020 Safety and Health Awards, the industry’s premier safety award program…
Producers Sign Orders
Boise Cascade in Chester, SC has ordered its third veneer dryer system from USNR. The 14-section steam heated M-72 jet dryer includes USNR’s Unloader, Gsc2000 scanning system, Sequoia Sentry moisture detector, and a 4-bin random/sheet stacker…
Find Us On Social
Newsletter
The monthly Panel World Industry Newsletter reaches over 3,000 who represent primary panel production operations.
Subscribe/Renew
Panel World is delivered six times per year to North American and international professionals, who represent primary panel production operations. Subscriptions are FREE to qualified individuals.
Advertise
Complete the online form so we can direct you to the appropriate Sales Representative. Contact us today!