CalPlant I Gears Up For First Board

CalPlant I, the new rice straw-based MDF plant in Willows, Calif.,is starting up and commissioning all areas of the mill. This includes the straw preparation building, where 20 loaded straw trailers have been staged; the refiner and dryer area, where dust collection and pneumatic transfer is undergoing final calibration; the first truckload of pMDI glue has arrived; forming and pressing is beginning pneumatic transfer of fiber and commissioning of the press sizing systems; commissioning of the intermediate stacking, sanding and sawing system; and likewise for the spark detection and quenching system. First board production is anticipated during the first week of November.
RELATED ARTICLES
CALPLANT I NEARS THE FINISH (OR STARTING) LINE
Latest News
Ellis Martin Led Family Business
Ellis Spencer Martin, one of the family members responsible for the growth of Roy O. Martin Lumber and Martin Timber Co., died October 18, 2013 in Alexandria, La. He was 96. The eldest son of…
Knokey Behind Many Plywood Developments
Gene (Eugene Rae) Knokey, the technical inspiration and motivating force behind the development of much of the plywood process machinery still considered today the standard of the industry, died August 22, 2013 in Anacortes, Wash.…
They Were The Best And The Brightest
Article by Rich Donnell, Editor-in-Chief, Panel World 2013 On page 8 we report on the death of Gene Knokey, who during his era was one of the most brilliant plywood machinery men in the industry.…
Find Us On Social
Newsletter
The monthly Panel World Industry Newsletter reaches over 3,000 who represent primary panel production operations.
Subscribe/Renew
Panel World is delivered six times per year to North American and international professionals, who represent primary panel production operations. Subscriptions are FREE to qualified individuals.
Advertise
Complete the online form so we can direct you to the appropriate Sales Representative. Contact us today!