CalPlant I Gears Up For First Board

CalPlant I, the new rice straw-based MDF plant in Willows, Calif.,is starting up and commissioning all areas of the mill. This includes the straw preparation building, where 20 loaded straw trailers have been staged; the refiner and dryer area, where dust collection and pneumatic transfer is undergoing final calibration; the first truckload of pMDI glue has arrived; forming and pressing is beginning pneumatic transfer of fiber and commissioning of the press sizing systems; commissioning of the intermediate stacking, sanding and sawing system; and likewise for the spark detection and quenching system. First board production is anticipated during the first week of November.
RELATED ARTICLES
CALPLANT I NEARS THE FINISH (OR STARTING) LINE
Latest News
Portland Event Continues To Emphasize Veneer-Plywood
Story by Rich Donnell, Editor-In-Chief As far as we’re concerned, the stretch run begins now for the Timber Processing & Energy Expo, which will...
Maloney Drove Composite Board Industry Forward
Thomas M. Maloney, a pioneer and leader in the development and growth of the composite board industry, died on June 18, 2014 at his home in Pullman,...
‘He Who Is On Guard Even When Safe’
Story by Rich Donnell, Editor-In-Chief There’s a whole lot of health and safety going on in this issue. Our cover story, for example, is the Huber...
Find Us On Social
Newsletter
The monthly Panel World Industry Newsletter reaches over 3,000 who represent primary panel production operations.
Subscribe/Renew
Panel World is delivered six times per year to North American and international professionals, who represent primary panel production operations. Subscriptions are FREE to qualified individuals.
Advertise
Complete the online form so we can direct you to the appropriate Sales Representative. Contact us today!