CalPlant I Gears Up For First Board

CalPlant I, the new rice straw-based MDF plant in Willows, Calif.,is starting up and commissioning all areas of the mill. This includes the straw preparation building, where 20 loaded straw trailers have been staged; the refiner and dryer area, where dust collection and pneumatic transfer is undergoing final calibration; the first truckload of pMDI glue has arrived; forming and pressing is beginning pneumatic transfer of fiber and commissioning of the press sizing systems; commissioning of the intermediate stacking, sanding and sawing system; and likewise for the spark detection and quenching system. First board production is anticipated during the first week of November.
RELATED ARTICLES
CALPLANT I NEARS THE FINISH (OR STARTING) LINE
Latest News
LIGNA 2015: Visitor Numbers Up By 7% To Roughly 96,000
According to estimates made by the organizer Deutsche Messe, visitor numbers at this year’s Ligna 2015 in Hannover increased to roughly 96,000,...
Weinig Sold 190 Machines At LIGNA 2015
Weinig's solid wood business unit solid sold a total of 190 machines and systems at LIGNA 2015, the big German trade show held in Hannover last...
Empire State Building Re-Engineered In Wood
Tall wood buildings proponent and famed architect Michael Green teamed with Finnish timber and panel maker Metsä Wood to redesign the iconic Empire...
Find Us On Social
Newsletter
The monthly Panel World Industry Newsletter reaches over 3,000 who represent primary panel production operations.
Subscribe/Renew
Panel World is delivered six times per year to North American and international professionals, who represent primary panel production operations. Subscriptions are FREE to qualified individuals.
Advertise
Complete the online form so we can direct you to the appropriate Sales Representative. Contact us today!