CalPlant I Gears Up For First Board

CalPlant I, the new rice straw-based MDF plant in Willows, Calif.,is starting up and commissioning all areas of the mill. This includes the straw preparation building, where 20 loaded straw trailers have been staged; the refiner and dryer area, where dust collection and pneumatic transfer is undergoing final calibration; the first truckload of pMDI glue has arrived; forming and pressing is beginning pneumatic transfer of fiber and commissioning of the press sizing systems; commissioning of the intermediate stacking, sanding and sawing system; and likewise for the spark detection and quenching system. First board production is anticipated during the first week of November.
RELATED ARTICLES
CALPLANT I NEARS THE FINISH (OR STARTING) LINE
Latest News
North American EWP Production Declines Further
North American production of engineered wood products (EWP) declined again in the first quarter of 2015. In spite of a customary seasonal revival...
B.C. OSB Mill Given Green Light On MDI
B.C. OSB Mill Given Green Light On MDI Despite local opposition, Peace Valley Oriented Strand Board (OSB) in Fort St. John has been granted an...
StemWood Veneer Will Close Operations
StemWood, a veneer and lumber mill, says it will wind down operations by the end of the 2015. StemWood produces high quality 4/4 walnut, cherry,...
Find Us On Social
Newsletter
The monthly Panel World Industry Newsletter reaches over 3,000 who represent primary panel production operations.
Subscribe/Renew
Panel World is delivered six times per year to North American and international professionals, who represent primary panel production operations. Subscriptions are FREE to qualified individuals.
Advertise
Complete the online form so we can direct you to the appropriate Sales Representative. Contact us today!