CalPlant I Gears Up For First Board

CalPlant I, the new rice straw-based MDF plant in Willows, Calif.,is starting up and commissioning all areas of the mill. This includes the straw preparation building, where 20 loaded straw trailers have been staged; the refiner and dryer area, where dust collection and pneumatic transfer is undergoing final calibration; the first truckload of pMDI glue has arrived; forming and pressing is beginning pneumatic transfer of fiber and commissioning of the press sizing systems; commissioning of the intermediate stacking, sanding and sawing system; and likewise for the spark detection and quenching system. First board production is anticipated during the first week of November.
RELATED ARTICLES
CALPLANT I NEARS THE FINISH (OR STARTING) LINE
Latest News
Roseburg Plywood Is Said To Minimize Open Knots, Core Gaps, Warping
Roseburg says its RigidCore plywood has entered the market for use in industrial applications for CNC machining of furniture, cabinetry and other...
Third TP&EE Will Be The Largest
Organizers of the third Timber Processing & Energy Expo announced that indoor exhibit space is 98% sold out. Some space remains outside. Hosted...
PELICE 2016 Will Get To The Heart Of The Matter
Article by Rich Donnell, Editor-In-Chief The Panel & Engineered Lumber International Conference & Expo (PELICE) is held every other year in...
Find Us On Social
Newsletter
The monthly Panel World Industry Newsletter reaches over 3,000 who represent primary panel production operations.
Subscribe/Renew
Panel World is delivered six times per year to North American and international professionals, who represent primary panel production operations. Subscriptions are FREE to qualified individuals.
Advertise
Complete the online form so we can direct you to the appropriate Sales Representative. Contact us today!