CalPlant I Gears Up For First Board

CalPlant I, the new rice straw-based MDF plant in Willows, Calif.,is starting up and commissioning all areas of the mill. This includes the straw preparation building, where 20 loaded straw trailers have been staged; the refiner and dryer area, where dust collection and pneumatic transfer is undergoing final calibration; the first truckload of pMDI glue has arrived; forming and pressing is beginning pneumatic transfer of fiber and commissioning of the press sizing systems; commissioning of the intermediate stacking, sanding and sawing system; and likewise for the spark detection and quenching system. First board production is anticipated during the first week of November.
RELATED ARTICLES
CALPLANT I NEARS THE FINISH (OR STARTING) LINE
Latest News
Canadian Building Will Be The Tallest Timber Structure In The World
Vancouver-based real estate developer PortLiving and world-renowned Japanese architect Shigeru Ban have unveiled plans for an upcoming hybrid timber...
Norbord Riding The Rising Wave Of OSB Sales
For years, it was known as the ugly duckling, cheaper alternative to plywood. One design maven described it as “like the turkey loaf of building...
Oregon Buildings Get $200K To Test Cross-Laminated Timber
Projects in Springfield and Portland have landed a collected $200,000 as leaders test the viability of cross-laminated timber. The funding, awarded...
Find Us On Social
Newsletter
The monthly Panel World Industry Newsletter reaches over 3,000 who represent primary panel production operations.
Subscribe/Renew
Panel World is delivered six times per year to North American and international professionals, who represent primary panel production operations. Subscriptions are FREE to qualified individuals.
Advertise
Complete the online form so we can direct you to the appropriate Sales Representative. Contact us today!