CalPlant I Gears Up For First Board

CalPlant I, the new rice straw-based MDF plant in Willows, Calif.,is starting up and commissioning all areas of the mill. This includes the straw preparation building, where 20 loaded straw trailers have been staged; the refiner and dryer area, where dust collection and pneumatic transfer is undergoing final calibration; the first truckload of pMDI glue has arrived; forming and pressing is beginning pneumatic transfer of fiber and commissioning of the press sizing systems; commissioning of the intermediate stacking, sanding and sawing system; and likewise for the spark detection and quenching system. First board production is anticipated during the first week of November.
RELATED ARTICLES
CALPLANT I NEARS THE FINISH (OR STARTING) LINE
Latest News
Engineered Lumber Industry Sees A Positive Boost
Like much of the industry, engineered wood producers are still navigating a fickle recovery in which builders are challenged by supply constraints,...
Universal Forest Products Will Expand Internationally
Michael Mordell, a senior executive of Universal Forest Products, Inc., was named Executive VP of International Operations to lead a new...
Canadian Veneer Mill Thrives Amid Market Uncertainty
The log yard is filled with two months’ worth of inventory and activity is humming at Columbia Forest Products’ veneer plant, east of North Bay....
Find Us On Social
Newsletter
The monthly Panel World Industry Newsletter reaches over 3,000 who represent primary panel production operations.
Subscribe/Renew
Panel World is delivered six times per year to North American and international professionals, who represent primary panel production operations. Subscriptions are FREE to qualified individuals.
Advertise
Complete the online form so we can direct you to the appropriate Sales Representative. Contact us today!