CalPlant I Gears Up For First Board

CalPlant I, the new rice straw-based MDF plant in Willows, Calif.,is starting up and commissioning all areas of the mill. This includes the straw preparation building, where 20 loaded straw trailers have been staged; the refiner and dryer area, where dust collection and pneumatic transfer is undergoing final calibration; the first truckload of pMDI glue has arrived; forming and pressing is beginning pneumatic transfer of fiber and commissioning of the press sizing systems; commissioning of the intermediate stacking, sanding and sawing system; and likewise for the spark detection and quenching system. First board production is anticipated during the first week of November.
RELATED ARTICLES
CALPLANT I NEARS THE FINISH (OR STARTING) LINE
Latest News
Arauco Announces Layoffs At North Carolina Plant
Arauco Announces Layoffs At North Carolina Plant Arauco Panels USA, an American subsidiary of a Chilean plywood manufacturer, is cutting jobs in...
WoodWorks Leads Blast Testing Project For Cross-Laminated Timber
Videos are now available showing a series of live blast tests on three cross-laminated timber (CLT) structures at Tyndall Air Force Base, conducted...
Report: Wood-Based Panel Market To Exceed $35 Billion By 2023
Wood based panel market size was valued over USD 16 billion in 2015 and is anticipated to grow at CAGR of over 13% and exceed USD 35 billion by...
Find Us On Social
Newsletter
The monthly Panel World Industry Newsletter reaches over 3,000 who represent primary panel production operations.
Subscribe/Renew
Panel World is delivered six times per year to North American and international professionals, who represent primary panel production operations. Subscriptions are FREE to qualified individuals.
Advertise
Complete the online form so we can direct you to the appropriate Sales Representative. Contact us today!