CalPlant I Gears Up For First Board

CalPlant I, the new rice straw-based MDF plant in Willows, Calif.,is starting up and commissioning all areas of the mill. This includes the straw preparation building, where 20 loaded straw trailers have been staged; the refiner and dryer area, where dust collection and pneumatic transfer is undergoing final calibration; the first truckload of pMDI glue has arrived; forming and pressing is beginning pneumatic transfer of fiber and commissioning of the press sizing systems; commissioning of the intermediate stacking, sanding and sawing system; and likewise for the spark detection and quenching system. First board production is anticipated during the first week of November.
RELATED ARTICLES
CALPLANT I NEARS THE FINISH (OR STARTING) LINE
Latest News
Arauco Breaks Ground On Michigan Particleboard Plant
Arauco North America has broken ground on its $400 million particleboard plant. The new operation will employ more than 250 and will make both raw...
Washington CLT: ‘The Greatest Thing Since Sliced Wood’
Washington CLT: ‘The Greatest Thing Since Sliced Wood’ Cross laminated timber, or CLT, is being touted as a revolutionary and environmentally...
Settlement Looks Good For Huber
Settlement Looks Good For Huber Huber Engineered Woods LLC (HEW) reports it has “achieved” a negotiated settlement with Georgia-Pacific Wood...
Find Us On Social
Newsletter
The monthly Panel World Industry Newsletter reaches over 3,000 who represent primary panel production operations.
Subscribe/Renew
Panel World is delivered six times per year to North American and international professionals, who represent primary panel production operations. Subscriptions are FREE to qualified individuals.
Advertise
Complete the online form so we can direct you to the appropriate Sales Representative. Contact us today!