CalPlant I Gears Up For First Board

CalPlant I, the new rice straw-based MDF plant in Willows, Calif.,is starting up and commissioning all areas of the mill. This includes the straw preparation building, where 20 loaded straw trailers have been staged; the refiner and dryer area, where dust collection and pneumatic transfer is undergoing final calibration; the first truckload of pMDI glue has arrived; forming and pressing is beginning pneumatic transfer of fiber and commissioning of the press sizing systems; commissioning of the intermediate stacking, sanding and sawing system; and likewise for the spark detection and quenching system. First board production is anticipated during the first week of November.
RELATED ARTICLES
CALPLANT I NEARS THE FINISH (OR STARTING) LINE
Latest News
Roseburg Forest Products To Build New Engineered Wood Plant In South Carolina
Oregon-based Roseburg Forest Products will expand its operations in the southeastern United States with construction of a new engineered wood...
EPA Withdraws Final Rule Delay For Formaldehyde
After receiving negative feedback from the industry, the Environmental Protection Agency (EPA) withdrew its Direct Final Rule Wednesday, removing...
First Southeast U.S. CLT Plant Announced
From: Panel World Editors International Beams plans to build the first cross-laminated timber production facility in the Southeastern U.S. in...
Find Us On Social
Newsletter
The monthly Panel World Industry Newsletter reaches over 3,000 who represent primary panel production operations.
Subscribe/Renew
Panel World is delivered six times per year to North American and international professionals, who represent primary panel production operations. Subscriptions are FREE to qualified individuals.
Advertise
Complete the online form so we can direct you to the appropriate Sales Representative. Contact us today!