CalPlant I Gears Up For First Board

CalPlant I, the new rice straw-based MDF plant in Willows, Calif.,is starting up and commissioning all areas of the mill. This includes the straw preparation building, where 20 loaded straw trailers have been staged; the refiner and dryer area, where dust collection and pneumatic transfer is undergoing final calibration; the first truckload of pMDI glue has arrived; forming and pressing is beginning pneumatic transfer of fiber and commissioning of the press sizing systems; commissioning of the intermediate stacking, sanding and sawing system; and likewise for the spark detection and quenching system. First board production is anticipated during the first week of November.
RELATED ARTICLES
CALPLANT I NEARS THE FINISH (OR STARTING) LINE
Latest News
Arauco Michigan Mill To Convert Low-Grade Wood Into Quality Particleboard
Dying, deformed and diseased trees will be key ingredients of particleboard manufactured at the new Arauco panel mill in northern Michigan. "All of...
EPA Updates, Clarifies Formaldehyde Emission Standards For Composite Wood
The Environmental Protection Agency (EPA) has proposed technical amendments to its formaldehyde emissions standards for composite wood products....
Mass Timber Institute Officially Launched In Toronto
The Mass Timber Institute officially launched on October 30 with an industry leaders’ collaboration event held at their offices at 110 Yonge Street...
Find Us On Social
Newsletter
The monthly Panel World Industry Newsletter reaches over 3,000 who represent primary panel production operations.
Subscribe/Renew
Panel World is delivered six times per year to North American and international professionals, who represent primary panel production operations. Subscriptions are FREE to qualified individuals.
Advertise
Complete the online form so we can direct you to the appropriate Sales Representative. Contact us today!