CalPlant I Gears Up For First Board

CalPlant I, the new rice straw-based MDF plant in Willows, Calif.,is starting up and commissioning all areas of the mill. This includes the straw preparation building, where 20 loaded straw trailers have been staged; the refiner and dryer area, where dust collection and pneumatic transfer is undergoing final calibration; the first truckload of pMDI glue has arrived; forming and pressing is beginning pneumatic transfer of fiber and commissioning of the press sizing systems; commissioning of the intermediate stacking, sanding and sawing system; and likewise for the spark detection and quenching system. First board production is anticipated during the first week of November.
RELATED ARTICLES
CALPLANT I NEARS THE FINISH (OR STARTING) LINE
Latest News
New Strength And Safety Tests Pit Timber Against Concrete And Steel
Thanks to innovative construction materials like cross-laminated timber (CLT) and laminated veneer lumber (LVL), wooden buildings are no longer mere...
Freres Lumber Builds For The Future With New Mass Plywood Panels
Freres Lumber Builds For The Future With New Mass Plywood Panels Tyler Freres, vice president of sales for Freres Lumber Co., walked through...
LIGNA 2019: Showcases And Events For The Primary Wood Industry
Next year, from 27 to 31 May, the world's leading trade fair for woodworking and wood processing plant, machinery and tools will present a wealth of...
Find Us On Social
Newsletter
The monthly Panel World Industry Newsletter reaches over 3,000 who represent primary panel production operations.
Subscribe/Renew
Panel World is delivered six times per year to North American and international professionals, who represent primary panel production operations. Subscriptions are FREE to qualified individuals.
Advertise
Complete the online form so we can direct you to the appropriate Sales Representative. Contact us today!