CalPlant I Gears Up For First Board
CalPlant I, the new rice straw-based MDF plant in Willows, Calif.,is starting up and commissioning all areas of the mill. This includes the straw preparation building, where 20 loaded straw trailers have been staged; the refiner and dryer area, where dust collection and pneumatic transfer is undergoing final calibration; the first truckload of pMDI glue has arrived; forming and pressing is beginning pneumatic transfer of fiber and commissioning of the press sizing systems; commissioning of the intermediate stacking, sanding and sawing system; and likewise for the spark detection and quenching system. First board production is anticipated during the first week of November.
RELATED ARTICLES
CALPLANT I NEARS THE FINISH (OR STARTING) LINE
Latest News
Jason Ringblom Now Leads LP Building Solutions
LP Building Solutions Taps Jason Ringblom As President LP Building Solutions (LP) has announced the appointment of Executive Vice President, General...
TP&EE 2026 Begins Exhibitor Renewal
TP&EE 2026 Begins Exhibitor Renewal Organizers of the Timber Processing & Energy Expo (TP&EE) announced that the exhibitor renewal...
Kirk Blanchette To Lead Huber Engineered Wood
Kirk Blanchette To Lead Huber Engineered WoodHuber Engineered Woods (HEW) has announced that Kirk Blanchette will become President of HEW,...
Find Us On Social
Newsletter
The monthly Panel World Industry Newsletter reaches over 3,000 who represent primary panel production operations.
Subscribe/Renew
Panel World is delivered six times per year to North American and international professionals, who represent primary panel production operations. Subscriptions are FREE to qualified individuals.
Advertise
Complete the online form so we can direct you to the appropriate Sales Representative. Contact us today!