Boise Cascade Operation At Elgin Is Up In Air
While the demand and pricing for plywood has been favorable during 2020 and the Elgin operation was profitable during the second and third quarters, Boise states that its ongoing ability to use Elgin’s waste and storm water has been modified by the Oregon Dept. of Environmental Quality (ODEQ). The new permit constraints create uncertainty around the future operations at the site, according to Boise, which has significantly reduced its purchases of logs for the Elgin operation considering the uncertainty created by the change in environmental constraints and possible curtailment. “At the current time, we do not expect to have enough logs available to operate throughout the entire winter even if the open concerns with ODEQ are favorably resolved before the end of the year,” the company states.
The Elgin facility currently produces approximately 10% of Boise’s dry veneer production, the majority of which is sold as plywood and represents approximately 16% of Boise’s plywood sales.
The company says it will continue to evaluate plywood market conditions, log supply availability, operating costs, environmental permits and other factors influencing the long-term viability of the Elgin plywood operation as the situation warrants.
Latest News
LP Opens New HQ
LP Building Solutions (LP) celebrated a landmark day in company history on Aug. 19, 2022 with the grand opening of its new global headquarters in Nashville, Tennessee. The new headquarters, which spans the top two floors—all 60,000 sq. ft.—of the Creative Office Building in Midtown’s Broadwest development, allows LP to further expand its corporate hybrid workplace model while upgrading its office environment…
PELICE 2022 Brought Everything From Taguchi To Board Quality Control
PART THREE: This is the third of a four-part series summarizing the presentations delivered during the Panel & Engineered Lumber International Conference & Expo (PELICE) held this spring and hosted by Panel World in Atlanta March 31 to April 1. The first two parts appeared in the May and July issues of Panel World, and the fourth and final selection will be in the upcoming November issue…
TP&EE Hosts Mass Timber Developments
The biennial Timber Processing & Energy Expo, following a pandemic-induced cancellation in 2020, returns this September 28-30 to the Portland Exposition Center in Portland, Ore. Hatton-Brown Expositions, an affiliate of Panel World magazine, has hosed the event since 2010.
“It’s hard to believe it has been four years since TP&EE was held, and what a strange trip it has been,” comments Rich Donnell, TP&EE Show Director and Editor-in-Chief of Panel World. “The important thing is that we’re back face-to-face. ‘Virtual’ is okay, but it’s not like being there.”
Find Us On Social
Newsletter
The monthly Panel World Industry Newsletter reaches over 3,000 who represent primary panel production operations.
Subscribe/Renew
Panel World is delivered six times per year to North American and international professionals, who represent primary panel production operations. Subscriptions are FREE to qualified individuals.
Advertise
Complete the online form so we can direct you to the appropriate Sales Representative. Contact us today!