Boise Cascade Operation At Elgin Is Up In Air 

Boise Cascade has issued a Worker Adjustment and Retraining Notification (WARN) Act notice to its employees at its operations in Elgin, Ore. “We issued the notice in order to ensure that all employees are aware it is possible the mill will have to reduce production levels beginning on or about January 1, 2021,” the company states.

While the demand and pricing for plywood has been favorable during 2020 and the Elgin operation was profitable during the second and third quarters, Boise states that its ongoing ability to use Elgin’s waste and storm water has been modified by the Oregon Dept. of Environmental Quality (ODEQ). The new permit constraints create uncertainty around the future operations at the site, according to Boise, which has significantly reduced its purchases of logs for the Elgin operation considering the uncertainty created by the change in environmental constraints and possible curtailment. “At the current time, we do not expect to have enough logs available to operate throughout the entire winter even if the open concerns with ODEQ are favorably resolved before the end of the year,” the company states.

The Elgin facility currently produces approximately 10% of Boise’s dry veneer production, the majority of which is sold as plywood and represents approximately 16% of Boise’s plywood sales.

The company says it will continue to evaluate plywood market conditions, log supply availability, operating costs, environmental permits and other factors influencing the long-term viability of the Elgin plywood operation as the situation warrants.

 

Latest News

SmartLam Teams With RedBuilt

SmartLam North America and RedBuilt announced a partnership to supply cross-laminated timber (CLT) products and solutions to architects, engineers and contractors for projects using the mass timber building technology…

Idaho Veneer Closes Doors

Longtime independent veneer producer Idaho Veneer Co. in Post Falls, Id. has closed its doors, as the family ownership decided to sell the mill property, which has slowly “moved” from outside of town to the middle of town as the area has grown…

Gruen-Wald Laminates Orders USNR RF Technology

Gruen-Wald Laminates is investing in a new radio frequency (RF) generator and 24 ft. long curing tunnel from USNR for its fingerjoint line at its plant in Tea, SD. This is the second tunnel at the plant…

Find Us On Social

Newsletter

The monthly Panel World Industry Newsletter reaches over 3,000 who represent primary panel production operations.

Subscribe/Renew

Panel World is delivered six times per year to North American and international professionals, who represent primary panel production operations. Subscriptions are FREE to qualified individuals.

Advertise

Complete the online form so we can direct you to the appropriate Sales Representative. Contact us today!